BPA proposes to fund the Yakama Nation to plant native vegetation on 10 acres of riparian area at river mile 19 of Rock Creek, a tributary to the K…
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife (ODFW) to remove debris and improve an access roa…
Perform conceptual design studies to integrate the NRL Electrolytic Cation Exchange Module system within the OE Buoy wave energy converter to devel…
The objective of this effort is to design and install a modular, pilot-scale test unit to process 10,000 gallons per day (gal/day) or 7 gallons per…
Project management, simulation work,electrolysis to methanol short stack of individually connected cells to test and validate methanol production f…
Bench-scale research and development of an electrochemical reactor for direct ocean CO2 capture, as well as data analysis, technoeconomic analyses,…
The applicant will conduct office and lab-based work. …
The project team will develop electrochemical tubes to remove dissolved inorganic carbon (DIC) from seawater. A theoretical model and lab-scale sys…
Admin/Office/Training/Dissemination for SOPO Tasks 10, 11, and 12 for 2 sites (OEE and PSEC). Associated EQs from both sites Prime (Univ. of Illin…
Administrative and project management activities; computer modeling and analysis; field deployment of methane monitoring sensors (ground and aerial…