A new 69 kV transmission line 4.0 miles long will be constructed from the existing Winlock substation (corner of SW Kerron St. and Hining Ave.) to …
This program will develop a "virtual power plant"(VPP) that leverages customer-sited batteries already installed in residential locations to export…
Replace an outdated generator(engine) with a new generator(engine)…
OCED is currently proposing to issue two additional voucher opportunities under the PIA: Voucher Opportunity 9: "Planning and Validation of Industr…
The U.S. Department of Energy (DOE) is proposing to provide funding to North Carolina State University (NC State) to lead the efforts of PowerAmeri…