EIS-0159: Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder, and Weld Counties, Colorado

The Western Area Power Administration proposed to uprate its existing 115-k Flatiron-Erie transmission line. It proposed to build 27 new wood H-frame structures along the line, to replace or modify 45 of the existing structures, and to remove 11 of them.