Summary
The Western Area Power Administration (WAPA) proposes to upgrade approximately 78 miles of 115-kV transmission line between the Beaver Creek Substation, east of Brush, Colorado; the Hoyt Substation, west of Hoyt, Colorado; and the Erie Substation, near Brighton, Colorado.