DOE-LM is proposing to conduct routine long-term surveillance and maintenance (LTS and M) actions at the Split Rock, Wyoming, Disposal Site located…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 3-4, 4-8, and 27-4 on the Boysen-Pil…
Overhead to underground conversion for approximately 25 miles of powerline. Vegetation management is to be performed. Replacement of overhead trans…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing structures on the Alcova-Copper Mountain (A-COP…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the existing overhead ground wire (OGW) with optical gro…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
Western Area Power Administration (WAPA), Colorado River Storage Project (CRSP) region proposes new formula rates for the Colorado River Storage Project transmission and ancillary services for CRSP’s costs to be recovered under the Southwest Power Pool’s (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP.
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management between structures 6 to13 …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…