Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the generator at Sherman Hill Communication Site in Alba…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure and switch replacements on its existing Pilot …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) proposes to approve an interconnection Delivery Point (DP) request from Tri-S…
The Office of Legacy Management (LM) is proposing to continue a regenerative grazing study at the Shirley Basin South site (SBS) and surrounding pr…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Thermopolis-Badw…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Thermopolis-Lovel…
Overhead to underground conversion for approximately 25 miles of powerline. Vegetation management is to be performed. Replacement of overhead trans…
DOE-LM is proposing to conduct routine long-term surveillance and maintenance (LTS and M) actions at the Split Rock, Wyoming, Disposal Site located…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 3-4, 4-8, and 27-4 on the Boysen-Pil…
Overhead to underground conversion for approximately 25 miles of powerline. Vegetation management is to be performed. Replacement of overhead trans…