The U.S. Department of Energy (DOE) proposes to analyze fission gas from samples of high burnup boiling water reactor spent fuel rods (BWR rods), a…
Transfer of Tugger Truck to PECMC. …
730-1B Renovate lobby area.…
105-C Assembly has some locations inside and outside with damaged panels and damaged outer area flashing. Transite panels containing asbestos are p…
The 704-60E trailer currently does not have a PA amplifier for its speakers and relies on amplifier in another trailer. The proposed activity is to…
Water and Ethylene Glycol mixture from Drum 6 in 211-9F will be drained into Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment …
Removal and Replacement of Defense Waste Processing Facility Plant Air Compressors.…
The facility needs a redesign of the current camera grout hopper lid assembly to ease maintenance activities.…
The Stack 291-F Canyon Exhaust Fan (CAEX) No. 2 Power Analyzer is not working intermittently and will be swapped with CAEX No. 3 Power Analyzer.…
Maintenance on equipment and leaks repair for MK-18A located in building 773-A shielded cells.…