Road G Milling, Paving, and Striping.…
These work instructions are to safely changeout the leaky eyewash bowl and components for the permanent Eyewash/Safety Shower located at 717-5N.…
A caustic leak has been identified near column 57. Removal and installation of asbestos insulation is required for this repair.…
This EEC covers all flushing, inspections, and maintenance of the fire water systems across the SRS. These activities are conducted by the SRS Fire…
Construction is to replace eyewash bowl/valve assembly in building 717-8N…
Replace 152-7K diesel generator and accessories due to age and difficulty obtaining parts.…
Roof Replacement of Administrative Building 704-K…
This Temporary Modification will install a Peterson Products Company Multi-Flex inflatable plug inside manhole P68 near the 234-H cooling towers.…
This EEC is a revision of a legacy EEC: OBU-H-2020-0113. This EEC addresses the MT to design and install an interim replacement for the obsolete Gl…
The U.S. Department of Energy (DOE) is proposing to provide funding to Spartanburg County, South Carolina (SC) for designing and installing landfil…