Installation of mesh pole wraps to mitigate wildfires. …
The U.S. Department of Energy Office of Legacy Management (LM) owns and manages an extraction and monitoring well network adjacent to the Shiprock,…
Installation of electronic reclosers. The majority will be installed on existing poles within rights-of-way while some instances of new poles withi…
This project establishes a staging area for N3B to store pallets at Technical Area 03, Ion Beam Facility, for use on various N3B Aggregate Area remediation projects.
Sub-recipient will develop a wildfire mitigation plan its service area, located in the northern part of Rio Arriba County, NM. The project will not…
The National Park Service proposes to reconstruct or replace existing utilities (electrical, water, gas, and communication) in new right-of-way (ROW) along State Road 4 in Technical Area (TA) 39 at Los Alamos National Laboratory (LANL).
BESS installation and microgrid creation at 3 locations to allow the locations to island during times of extreme weather. The microgrids will help …
Sub-recipient will rebuild three miles of access road and install culvert and erosion control material in area where access road under power line i…
DOE-LM proposes the following activities to support installation of six groundwater monitoring wells located outside of the Bluewater, New Mexico, …
Western Area Power Administration (WAPA), Colorado River Storage Project (CRSP) region proposes new formula rates for the Colorado River Storage Project transmission and ancillary services for CRSP’s costs to be recovered under the Southwest Power Pool’s (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP.