Bonneville Power Administration (BPA) proposes to add interior fencing and add additional base rock within the Grand Coulee Substation 230-kilovolt…
The U.S. Department of Energy (DOE) proposes to construct a Central Utility Plant (CUP) east of the Far Experimental Hall (FEH) Building 999 (B999)…
The existing Buildings 264-H and 264-2H Safety Significant (SS) Fire Suppression Systems (FSS) need to be upgraded/qualified to meet Seismic Design…
Convert Room B-070 in 773-A into a Vault-type Room (VTR). Connect the VTR to the existing 773-A ARGUS node.…
This EEC is a revision of a previous EEC. [OBU-H-2020-0116] This revision updates the previous prefix to SRTE. - Provide seismically qualified SC F…
Replace Fire Alarm Control Panel (FACP) in Support Building 902-8H for Cooling Tower 285-11H.…
The 1st Cycle Programmable Logic Controller (PLC) manufactured by Quantum is now considered obsolete. The replacement plan involves relocating the …
This categorical exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of a facility (including but not limit…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform safety and environmental improvements of a facility (including, but n…