The settler tank area outside the Material Access Center outside 105-L has a needed corrective action. A pipe needs a threaded cap on the drainage …
There are four heat exchangers on the roof of 105-K that are no longer in use. The facility has been asked to remove these along with surrounding i…
Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…
Removal of wood bridge from 294-1F.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform safety and environmental improvements of a facility (including, but n…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of facility (including but not limited…
The Health Protection Programmable Logic Controller (HP-PLC) (controller, main frame) monitors and controls the H Area New Manufacturing (HANM) Air…
The old REMACS Heating Ventilation and Air Conditioner (HVAC) unit and uninterruptable power supply (UPS) will be removed from the 15 telephone ro…
LM is proposing to conduct non-remedy-related routine and non-routine activities associated with the maintenance and ongoing management of the Rock…
Existing 789-2B conventional Notifier SFP 10UD Fire Alarm Control Panel (FACP) is obsolete, spare parts are no longer available, and needs to be re…