Convert Room B-070 in 773-A into a Vault-type Room (VTR). Connect the VTR to the existing 773-A ARGUS node.…
This EEC is a revision of a previous EEC. [OBU-H-2020-0116] This revision updates the previous prefix to SRTE. - Provide seismically qualified SC F…
Replace Fire Alarm Control Panel (FACP) in Support Building 902-8H for Cooling Tower 285-11H.…
The 1st Cycle Programmable Logic Controller (PLC) manufactured by Quantum is now considered obsolete. The replacement plan involves relocating the …
This categorical exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of a facility (including but not limit…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform safety and environmental improvements of a facility (including, but n…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Install pump and support lines to evacuate condensate from HVAC drain pan at the Criticality Control Overpack Pad in K-Area.…
This Categorical Exclusion Determination (CXD) addresses specific activities which can be performed at locations associated with Pantex Plant perta…