The MAGIS-100 experiment will be installed within the MINOS service building shaft. This project is to relocate existing infrastructure utilities t…
The DWPF 291-S Zone 1 Stack Continuous Air Monitor (CAM) is comprised of a KURZ isokinetic sampler and VALTEC MOD V radiation monitoring system. Th…
Upgrade four obsolete S-Area/DWPF airborne radioactivity monitors located in 221-S on the Mezzanine Level. These four existing monitors will be con…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
This project will scale a single-stage (Type I) Solid State Transformer (SST), that has been demonstrated in single module operation, to a cascaded…
The dip tube bubblers in the 511-S Recycle Waste Tank are being replaced with wide mouth bubblers to prevent future clogging of the bubblers.…
Upgrade Building 703-44A fire alarm system.…
Subrecipient proposes to make improvements to the controls on its existing electric distribution system. A complete description is found on p.2 of …
This Categorical Exclusion Determination (CXD) addresses specific activities which can be performed at locations associated with Pantex Plant perta…
Upgrade S-Area DWPF Personnel Accountability System (DPAS) by replacing the old obsolete systems hardware at each of the DWPF entry gates (701-S, 7…