The purpose of the action is to apply Categorical Exclusion (CX) B2.1 Workplace Enhancements as a Generic CX within Environmental Review Forms (ERF…
CX-034839: LCRA Sim Gideon (Power Generation Facility) Comprehensive Control and Monitoring Upgrades
Sub-recipient will Upgrade AVR with Power System Stabilizer, remove and replace disturbance monitoring equipment, install real-time vibration monit…
Sub-recipient will construct scaffolding, remove existing assemblies, demolish existing pipe and enclosure insulation assemblies and remove existin…
Sub-recipient will install a new wet pipe fire sprinkler system and an additional water supply connection in Units 1,2, and 3 mezzanine and ground …
This Categorical Exclusion Determination (CXD) addresses specific activities which can be performed at locations associated with Pantex Plant perta…
A buttress wall addition is being added to the Saltstone Vault 4, North Wall, for structural support…
The Saltstone Process Room ventilation is a once-through system not designed for continuous personnel occupation. Current Saltstone Process Room Ve…
The breathing air egress manifold will be replaced to increase flow capacity of the H Canyon Egress system. This will increase the reliability and …
The HMI ("Signal" software running on Windows 7 PC) for the Heating Ventilation and Air Conditioning (HVAC) system at the 2H control room building …
Mercury Modernization (MM) is a multi-year project that would redevelop a central area of the current Mercury town site to provide modern facilitie…