The U.S. Department of Energy (DOE) is proposing to provide funding to Wichita Public Schools (WPS) to perform energy efficiency upgrades at 29 sch…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the heating, ventilation, and air conditioning (HVAC) sy…
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
Improving the thermal envelope, replacing the HVAC system, upgrading the “black start” diesel generator systems of the generating plant, and instal…
The Effluent Treatment Facility (ETF) Laboratory heating, ventilation, and air conditioning system needs to be permanently replaced due to its age …
Replacement of lighting to take place at 736-A in rooms 101-A, 102, 124, 126, 129, 130, 131, 131-A, 132, 133, 134, 135, 136, 136-A, and 143 thru 15…
Equipment and infrastructure will be upgraded during the first 2 years of the project. Three existing combustion units, the Transport Reactor Demon…
This work includes the modification, construction, installation and operation of equipment at the Wyoming Integrated Test Center (WITC) in Gillette…
Personnel Gate installation between 705-K and 717-K.…
The breathing air egress manifold will be replaced to increase flow capacity of the H Canyon Egress system. This will increase the reliability and …