Bonneville Power Administration (BPA) proposes to install communications equipment and infrastructure at Warner Substation and Happy Camp Radio Sit…
Bonneville Power Administration (BPA) proposes to replace a 345/230-kilovolt (kV) transformer and install new oil containment liners around three 3…
Install 6 additional electrical whips at the 707-C PDC (Program Development Center) Lab (Room 112) to support SPD (Surplus Plutonium Disposition) e…
The proposed project is to upgrade controls at the existing TTPU power plant in Tuluksak, Alaska, and includes switchgear, VFD drives, daytank and …
Sub-recipient will install new equipment on existing utility facilities (i.e. poles) and electric meters within its service territory, legally reco…
Installation of AMI system across REC's service territory, covering SOPO Subtasks 3.2 (Outline System Integration Plan), 4.2 (Procure AMI/RF Mesh a…
Install wall navigators at 766-H conference rooms.…
Subawardee intends to purchase Supervisor Control and Data Acquisition (SCADA) equipment and install such at 8 existing substations within its elec…
Deploy artificial intelligence (AI)-driven technologies to enhance grid resilience through predictive vegetation and wildfire risk detection, along…
Microgrid-related installation activities.…