East River requested a new bay addition at WAPA's Beresford Substation in South Dakota. …
The Legacy Management Support (LMS) SOARS team proposes to remove the current data collection equipment at each of the 14 monitoring wells and inst…
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) power circuit breaker (PCB) and to complete additional equipment …
Installation of AMI system across REC's service territory. Poles and towers will be introduced in portions of the project.…
Deployment of sensors, cameras, software, system modeling, vegetation management, situational awareness, and other technologies and solutions to mi…
Sub-awardee proposes to overlay a commercially available grid monitoring network (Landis Gyr RF Gridstream IP Mesh) over its electric distributio…
Bonneville Power Administration (BPA) proposes to remove and replace a MOD at the Marion Substation. The work would include removal and replacement…
Subrecipient intends to install 84 new electric reclosers at 13 substations and strategic metering points within its 28 electric distribution circu…
Fire Alarm and ENS Control Panel Replacement (Pittsburgh, PA), Fire Alarm and ENS System Upgrade (Albany, OR), Utility Meter Installation (Albany, …