The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
The Kesselring Site Outfall 002 Redesign and Replacement Project consists of raising the bottom elevation of the Outfall 002 trench to eliminate the standing water that produces algae and the potential for turbulent discharges to the Glowegee Creek.
Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 …
Bonneville Power Administration (BPA) proposes to replace two temporary access road bridges located near structures 96/3 and 97/3 of the Chief Jose…
Bonneville Power Administration (BPA) proposes to improve and reconstruct existing access roads, construct new access roads, and correct conductor …
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Thermopolis-Badw…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Thermopolis-Lovel…
Bonneville Power Administration (BPA) proposes to correct one impairment on the John Day-Grizzly 500-kV No. 2 line and improve and reconstruct an a…
Bonneville Power Administration (BPA) proposes to perform several structure and equipment repairs, improvements, and replacements on its 25-mile-lo…