The Knolls Laboratory L4 Pumphouse Sinkhole Repair Project is being undertaken to repair an existing concrete retaining wall along the edge of the Mohawk River where the river water flow is eroding the retaining wall and the surrounding shale rock face.
DOE proposes to construct, operate, and decommission a temporary compacted soil liner/cap test pad, which will include a soil borrow area, within the industrialized area at the Paducah Site located near Kevil in McCracken County, Kentucky.
The Kesselring Site Building 28 AMB Test Facility Project consists of renovation to the basement to support upcoming testing.
The U.S. Department of Energy (DOE) plans to deactivate, demolish, and disposition ancillary small structures, piping or equipment, and tanks at the Paducah Site that supported the former uranium enrichment facilities and are aging and/or deteriorated, and no longer needed.
Bonneville Power Administration (BPA) is proposing to replace a deteriorating wood pole structure and associated hardware in BPA’s Olympia District…
Subcontractor shall provide all supervision, transportation, labor, materials and equipment to locate, excavate, and direct inspect two locations o…
Bonneville Power Administration (BPA) is proposing to replace 3 deteriorating wood pole structures and associated hardware and guy wires on the Wen…
Bonneville Power Administration (BPA) proposes to replace a crossarm and insulators and install guy anchors and eco-blocks around the Big Eddy-Che…
This EEC covers various general renovations for Building 701-1A. Scope includes D and R such as replacing cabinets, flooring/cove base replacement,…
Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (cross arms, in…