The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
The Kesselring Site Outfall 002 Redesign and Replacement Project consists of raising the bottom elevation of the Outfall 002 trench to eliminate the standing water that produces algae and the potential for turbulent discharges to the Glowegee Creek.
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
The U.S. Department of Energy (DOE) Paducah Site proposes to continue to manage polychlorinated biphenyl (PCB)-containing materials per 40 CFR Part 761, Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions, the Uranium Enrichment Toxic Substances Control Act (TSCA) Compliance Agreement (CA), and the TSCA Approval for Disposal of PCB Bulk Product (Mixed) Waste, and any other applicable agreements or policies, as needed.
The Knolls Laboratory Land Disposal Area (LDA) Corrective Measure Implementation (CMI) Project is being undertaken as a Corrective Measure remedy to remediate soil contaminated with metals and volatile organic compounds.
Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to replace the WHT-…
Twin County EPA is proposing four integrated projects, reconductoring and constructing a 1.5-mile tie line between Refuge and Swiftwater substation…
The PA is a redesign of the existing Glovebox Stripper blowers under MT-TRI-2021-00017 Rev. 2. It redesigns the existing Glovebox Stripper blowers …
Replace and/or secure wall tiles at 736-A room 204.…
Install oil boiler fuel flow meter at 784-7A.…