The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 500 hours of operat…
The Specific Manufacturing Capability (SMC) has identified the need for design and construction of a modern facility (TAN-1619) to support existing…
The purpose of the action is to dispose of the Nevis blocks, and this is needed because the longer the shielding blocks remain in storage, the grea…
Categorical Exclusion Determination
Categorical Exclusion Determination
Southwestern Power Administration proposes to modify and reconstruct its Allen Radio Tower communications site as part of the Spectrum Relocation p…
C-Zero Detector Hall and Neutrino Target Service Facility Renovation to Provide for a Radioactive Materials Storage Facility CX(s) Applied: B1.10, B1.15, B1.23Date: 41830 Location(s): IllinoisOffices(s): Fermi Site Office
Hadley Street TrailCX(s) Applied: B1.10, B4.12Date: 08/23/2010Location(s): Haltom, TexasOffice(s): Energy Efficiency and Renewable Energy