Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) proposes to conduct erosion control stabilization on its existing Kayenta-Shi…
LM is responsible for long-term surveillance and maintenance of the Tuba City, Arizona, Disposal Site. LM is proposing the Secondary Source Term an…
LM is proposing to remove the existing fence and install a new fence at the Monument Valley, Arizona, Processing Site located on Navajo Nation land…
The Salt River Project (SRP) is proposing to build a new double circuit 69-kilovolt (kV) transmission line near Ray Road in Section 30, Township 1 …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Long House Valley…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the San Carlos Apache Tribe (SCA) to design, develop, and install an integrated microgrid energy system, which would include a 500 kilowatt (kW) battery energy storage system (BESS), a 750 kW solar photovoltaic (PV) array, and a microgrid controller.
Replace (6) critical 230 kV wood structures with engineered foundational steel structures.…
Replace (3) critical 230 kV and (2) critical 115 kV wood structures with engineered foundational steel structures.…
Re-conductor existing transmission lines (Bicknell to 3 Points 115 kV line and 3 Points to Sandario Tap 115 kV line) and replace one static conduct…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…