Replace (6) critical 230 kV wood structures with engineered foundational steel structures.…
Replace (3) critical 230 kV and (2) critical 115 kV wood structures with engineered foundational steel structures.…
Re-conductor existing transmission lines (Bicknell to 3 Points 115 kV line and 3 Points to Sandario Tap 115 kV line) and replace one static conduct…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
The U.S. Department of Energy's (DOE) is proposing to assist the Gila River Tribe, and the U.S. Bureau of Reclamation to temporarily install a measurement system device on an existing project in Pinal County, Arizona.
The proposed actions would consist of a site condition assessment of the existing groundwater extraction wells, associated existing piping, existin…
Installation of pole wraps and vegetation management to mitigate wildfires. …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct a geotechnical investigation study on existing Structure…
The project will involve replacing existing expulsion fuses and arresters with non-expulsion types on power lines to reduce wildfire risk, conducti…
Construction related activities for equipment replacement and/or upgrades. This may include pole replacement, traversing unpaved roads, storage of …