Categorical Exclusion Determinations: Alaska

Upgrading mining site to 3-phase power. Extending power from transformer/meter to a switch gear unit. Installation of a 2000A switch gear unit. Ext…
SEAPA plans to construct a new, supplementary 115kV substation with a 25MVA transformer in a previously disturbed electric utility easement in Ketc…
MTNT plans to add SCADA capabilities to the local powerplant. Specifically: Purchase a new OnLogic data storage computer as specified. Purchase 5 …
Purchase a Caterpillar Excavator 320 equipped for mulching and tree clearing, to be utilized for mulching roadsides and runway areas to create effe…
Upgrading mining site to 3-phase power. Upgrading along existing overhead lines and adding a transmission pole. Installation of a meter and transfo…