Floodplain Assessment for the Los Alamos Canyon Omega Bridge Repairs Project (November 2026)

The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) published this Floodplain Assessment for the Los Alamos Canyon Omega Bridge Repairs at Los Alamos National Laboratory. Public comment period ends December 10, 2026.

Office of NEPA Policy and Compliance

November 24, 2026
Estimated Read Time   min

Los Alamos National Laboratory Floodplain Assessment for the Los Alamos Canyon Omega Bridge Repairs Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing permanent maintenance access to Omega Bridge at Los Alamos National Laboratory (LANL) at Technical Area 43. This floodplain assessment was prepared in accordance with DOE regulations set forth in Title 10 Code of Federal Regulations (CFR), Part 1022, Compliance with Floodplain and Wetland Environmental Review Requirements (CFR 2003). The proposed project would re-designate temporary access installed by the Omega Bridge maintenance project across the Los Alamos Canyon floodplain to permanent access for all future bridge maintenance activities. Project activities within the Los Alamos Canyon 100-year floodplain include two gravel/base course access roads and temporary laydowns.

Public Comment Opportunities

DOE/NNSA has published this floodplain assessment for a 15-day public review and comment period, ending December 10, 2026. Please provide comments on this Floodplain Assessment to Karen Armijo at:

U.S. Department of Energy, Los Alamos Field Office
ATTN: Karen Armijo
3747 West Jemez Road
Los Alamos, NM 87544
karen.armijo@nnsa.doe.gov

After the close of the public comment period and prior to issuing a floodplain statement of findings, NNSA will reevaluate the practicability of alternatives to the proposed floodplain action mitigating measures and take into account all substantive comments received during the public comment period. NNSA will endeavor to allow 15 days of public review prior to implementing the proposed action.