Analyzes a proposal to construct, connect, operate, and maintain a 5-mile-long 138-kV and 230-kV alternating current electric transmission system.

Office of NEPA Policy and Compliance

January 1, 2018
minute read time

Nogales Interconnection Project; Nogales, Arizona

DOE prepared a final environmental assessment (DOE/EA-2042) for the Nogales Interconnection Project.