August 29, 2016Building 1734 at the Materials and Fuels Complex (MFC-1734) is a temporary trailer that once housed construction personnel during asbestos abatement activities at MFC. The structure is no longer needed and is located where future buildings are proposed to be located (e.g., Sample Preparation Laboratory). The proposed project will remove and excess interior salvageable materials (furniture, computers, etc.), remove hazardous components (light bulbs, light tubes, smoke detectors, mercury switches, etc.), and demolish building. There are no sewer or water connections to the building. The pre-demolition salvage work will be performed by Battelle Energy Alliance, LLC (BEA) MFC facility personnel and the demolition will be performed by subcontractors.