CX-035020: Smart Technology for Advanced Resilient Transmission (START)

Rebuilding 2.75 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…

Office of NEPA Policy and Compliance

November 25, 2025
minute read time

Rebuilding 2.75 miles of overhead transmission line in Atlantic Beach NC, includes:  surveying, vegetation trimming, boring vertical holes to set new poles, driving pole bases, installing anchors, erecting poles, installing overhead assemblies, stringing conductor under tension, sagging conductor to temperature, clipping in conductor, deconstructing old pole line, removing old wooden and concrete poles.