Install biomass feedwater line support at 784-7A. The column will support the weight of the valve, transfer the load to the concrete floor and take…
Office of NEPA Policy and Compliance
November 25, 2025Install biomass feedwater line support at 784-7A. The column will support the weight of the valve, transfer the load to the concrete floor and take additional stress off of the boiler piping system.