Improve the resiliency of the two adjacent electrical feeder lines that deliver 100 percent of the electricity to Marblehead's 20,000 residents. In…
Office of NEPA Policy and Compliance
March 25, 2025Improve the resiliency of the two adjacent electrical feeder lines that deliver 100 percent of the electricity to Marblehead's 20,000 residents. In one section, Phase 1 in Salem, replace seven wooden overhead poles with stronger steel or composite poles. In a second section, Phase 2 in Marblehead, bury underground 1,800 feet of overhead lines running through a coastal-front wooded area.