NNSA-N-2024-00001 Revision 0: With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) …
Office of NEPA Policy and Compliance
January 8, 2025NNSA-N-2024-00001 Revision 0: With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fabric tension structure (Quonset hut) will be installed in N Area. The enlarged Quonset hut is needed to meet the warehouse and inventory demands. A mobile office structure and two new materials storage shelters to the west of existing Building 714-7N. This project will take place in phases. Revision 1: Scope update. SPD-owned Quonset hut (763-11N) will no longer be removed. Revision 2: Updated proposed activities to reflect current planned activities. Rev 0. of this EEC: Updated from EEC NNSA-N-2024-00001 to change the prefix and to include the addition of 6 HVAC units for commodity control.