CX-031342: Alaska Intertie Snow Load Resiliency

Reconfigure power line insulators on 80 miles of Alaska Intertie transmission line tower structures between Willow and Susitna river crossing.…

Office of NEPA Policy and Compliance

June 20, 2024
minute read time

Reconfigure power line insulators on 80 miles of Alaska Intertie transmission line tower structures between Willow and Susitna river crossing.