CX-031324: Intelligent Distribution Grid of the Future

Installation of a 3 MW, 12 MWH battery energy storage system (BESS), pole replacement, FLISR device installation, and fiber-ethernet switch install…

Office of NEPA Policy and Compliance

June 27, 2024
Estimated Read Time   min

Installation of a 3 MW, 12 MWH battery energy storage system (BESS), pole replacement, FLISR device installation, and fiber-ethernet switch installation.