Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install approximately 4.5 miles of optical ground wire (OPGW) an…

Office of NEPA Policy and Compliance

March 3, 2021
Estimated Read Time   min

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install approximately 4.5 miles of optical ground wire (OPGW) and perform routine maintenance on the access road associated with the Upper Molina Substation-Lower Molina Substation (UMW-LMW) 115-kV Transmission Line.