CX-022056: DeMoss-Fossil No. 1 Mile 12 Impairment project

Rebuilding three transmission tower structures on the DeMoss-Fossil No. 1 transmission line and adding an additional structure between the existin…

Office of NEPA Policy and Compliance

July 15, 2020
minute read time

Rebuilding three  transmission tower structures on the DeMoss-Fossil No. 1 transmission line and adding an additional structure between the existing structures 12-5 and 12-6.