Rebuilding three transmission tower structures on the DeMoss-Fossil No. 1 transmission line and adding an additional structure between the existin…
Office of NEPA Policy and Compliance
July 15, 2020Rebuilding three transmission tower structures on the DeMoss-Fossil No. 1 transmission line and adding an additional structure between the existing structures 12-5 and 12-6.