Remove and replace drywall in areas affected by the flooded floors in Buildings 730-1B, 730-2B, 730-4B, and 703-1B.…
Office of NEPA Policy and Compliance
January 28, 2020Remove and replace drywall in areas affected by the flooded floors in Buildings 730-1B, 730-2B, 730-4B, and 703-1B.