CX-020188: Remove and Replace Existing Carpet of Section A, Building 773-A

Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…

Office of NEPA Policy and Compliance

June 13, 2019
Estimated Read Time   min

Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.