CX-020184: Replace HVAC Rooftop Units at Building 703-47A

Perform replacement of Rooftop Units (RTUs) #3, 4, 6, and 7B on the roof of Building 703-47A. The disconnect switch for RTU 9B will be replaced.

Office of NEPA Policy and Compliance

June 14, 2019
Estimated Read Time   min

Perform replacement of Rooftop Units (RTUs) #3, 4, 6, and 7B on the roof of Building 703-47A.  The disconnect switch for RTU 9B will be replaced.