Categorical Exclusion Determination
Office of NEPA Policy and Compliance
January 24, 2019This proposed activity will remove insulation from steam and condensate piping and from the ductwork. The piping and reheat coil will be dismantled and removed from the 3rd Level heating, ventilation and air conditioning Supply System. Existing gasket material could not be verified; therefore, gaskets will be treated as asbestos waste.