CX-019184: Penetration and Pump Connection of 772-F High Activity Drain Cell C

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

October 15, 2018
minute read time

Design Engineering to design and perform a penetration into the concrete roof of the High Activity Drain Cell C to sample liquid and install a pump.