CX-018795: Tacoma to Raver 1 and 2 Number 1 Access Road Maintenance Project

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

August 3, 2018
minute read time

Bonneville Power Administration proposes to perform routine road maintenance along the access road for the Tacoma-Raver Number 1 Transmission Line, between 112th Ave. SE, Auburn, Washington, and Bonneville Power Administration transmission line structure 12/2. Access road work would include adding 30 feet of wood fencing, replacing two cross-drain culverts, adding a third cross-drain culvert, adding a landing, reconstructing 525 feet of ditch adjacent to the road, and grading, blading, and adding rock (improvements) to approximately 1,250 feet of existing serviceable access road. General equipment used for this type of project includes graders, rollers, excavators, and dump trucks.