Categorical Exclusion Determination
Office of NEPA Policy and Compliance
July 13, 2018The scope of the Kesselring Sluice Gate 1 is to replace this drainage and to upgrade the Site drainage capacity. Storm pipe will be replaced/installed from Sluice Gate 1 to the Site's lagoon.