CX-018553: Ross-Lexington Number 1 Span 2/2, 5/3, and 19/4 Impairment Remedy

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

July 23, 2018
Estimated Read Time   min

The Bonneville Power Administration is proposing to remedy three impairments along the Ross-Lexington No. 1 corridor ahead on line from structures 2/2, 5/3, and 19/4. Impairments occur when the distance between a surface and the overhead conductor is not sufficient to meet safety and reliability standards.