Categorical Exclusion Determination
Office of NEPA Policy and Compliance
June 4, 2018Bonneville Power Administration proposes to replace the existing bridge over Green Creek and perform routine road maintenance along the access road for the Holcomb-Naselle No. 1 Transmission Line, between structures 1/2 and 1/3. Proposed work includes removing the existing bridge and replacing it with a new, pre-cast, single-span, 16-foot by 60-foot bridge; and straightening, regrading, and shaping approximately 100 feet of access road northeast of the bridge.