Categorical Exclusion Determination
Office of NEPA Policy and Compliance
January 3, 2018The proposed action is the renovation of kitchen, doors, and hallways in 717-F. Replace water damage ceiling tile throughout kitchen, paint the lunch room including cabinet, replace the Vinyl Composition Tile in the kitchen area and the vending machine area, repair damaged cove base in the lunchroom, and paint the men’s room door and frame. Remove the tile in hallway and replace with Vinyl Composition Tile.