Categorical Exclusion Determination
Office of NEPA Policy and Compliance
December 4, 2017The activity includes installing a new remediation well, similar to the existing remediation wells series (e.g., RWM-1 through RWM-11), that pumps groundwater to the M-1 Air Stripper (M-Area). Design and installation of the recovery well (RWM018) is complete. Pump installation and other related construction activities are projected to begin in December 2017 for the remainder of the project.