Categorical Exclusion Determination
Office of NEPA Policy and Compliance
December 2, 2016Mill out existing asphalt for a distance of 120 feet on both sides of the railroad crossing (240 feet total) and repave the milled area.
Categorical Exclusion Determination
Office of NEPA Policy and Compliance
December 2, 2016Mill out existing asphalt for a distance of 120 feet on both sides of the railroad crossing (240 feet total) and repave the milled area.