Central Facilities Area 609 Wireless Test Bed Power Isolation CX(s) Applied: B1.31Date: 42472 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
April 12, 2016Central Facilities Area 609 Wireless Test Bed Power Isolation
CX(s) Applied: B1.31
Date: 42472
Location(s): Idaho
Offices(s): Nuclear Energy
Idaho National Laboratory (INL) Communications Department equipment and Wireless Test Bed (WTB) equipment are fed from the same electrical panel located in Room 200 at building 609 at the Central Facilities Area (CFA). INL Communications Department electrical outages have a negative impact on the WTB program. The proposed action would provide the WTB with the ability to isolate electrical power to WTB equipment and support systems at CFA-609.