CX-015354: Categorical Exclusion Determination

Materials and Fuels Complex 753 Compressor Installation CX(s) Applied: B1.31Date: 42513 Location(s): IdahoOffices(s): Nuclear Energy

Office of NEPA Policy and Compliance

May 23, 2016
Estimated Read Time   min

Materials and Fuels Complex 753 Compressor Installation
CX(s) Applied: B1.31
Date: 42513
Location(s): Idaho
Offices(s): Nuclear Energy

The proposed action would remove the old air compressor, receiver tank, and air dryer, including associated conduit, wiring, and components from the mezzanine, room 121, of building MFC-753 Mobile Shop, and install a new 15-hp reciprocating air compressor, new 240-gal horizontal receiver tank.

Document(s) Available for Download