Loading Line 6 Upgrades CX(s) Applied: B1.31Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
February 4, 2016Loading Line 6 Upgrades
CX(s) Applied: B1.31
Date: 02/04/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The Loading Line 6 needs upgrades to improve availability and maintainability, reduce time for system evacuation, improve Terrazzo loading capabilities, provide performance margin and flexibility for undefined reservoir designs or load requirements, and reduce glovebox congestion for ease of manual operations.