Protection Upgrades Project CX(s) Applied: B1.3, B1.7, B1.27Date: 05/14/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Office of NEPA Policy and Compliance
May 14, 2012Protection Upgrades Project
CX(s) Applied: B1.3, B1.7, B1.27
Date: 05/14/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to provide conduit, cable, and devices in the interior of buildings for the future use to convert the facilities to limited areas.
CX(s) Applied: B1.3, B1.7, B1.27
Date: 05/14/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to provide conduit, cable, and devices in the interior of buildings for the future use to convert the facilities to limited areas.