Optimization, Scale-up, and Design of Coal-Dependent Methanogenesis in Preparation for In-Situ Field Demonstration CX(s) Applied: A9, B3.6Date: 08/06/2015 Location(s): MontanaOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
August 6, 2015Optimization, Scale-up, and Design of Coal-Dependent Methanogenesis in Preparation for In-Situ Field Demonstration
CX(s) Applied: A9, B3.6
Date: 08/06/2015
Location(s): Montana
Offices(s): National Energy Technology Laboratory
Laboratory-scale experiments under field relevant conditions with native microbial communities to research accelerated in-situ coal biogasification and conceptual design in preparation for field tests.