July 17, 2014Central Facilities Area (CFA)-623/624 Electric Heat Conversion Project
CX(s) Applied: B3.9
Date: 41837
Location(s): Idaho
Offices(s): Nuclear Energy
The CFA-671 Boilers currently supply steam heat to buildings CFA-601, CFA-623 and CFA-674. Various problems such as steamline leaks/repairs, CFA-671 structural problems, age of the boilers, fuel costs, and upcoming 40 Code of Federal Regulations (CFR) 63 Subpart DDDDD regulations has led to the decision to replace the steam heat in these buildings with electric heat. The on-site air emissions associated with fuel burning equipment would be reduced with the inactivation of these boilers.
CX(s) Applied: B3.9
Date: 41837
Location(s): Idaho
Offices(s): Nuclear Energy
The CFA-671 Boilers currently supply steam heat to buildings CFA-601, CFA-623 and CFA-674. Various problems such as steamline leaks/repairs, CFA-671 structural problems, age of the boilers, fuel costs, and upcoming 40 Code of Federal Regulations (CFR) 63 Subpart DDDDD regulations has led to the decision to replace the steam heat in these buildings with electric heat. The on-site air emissions associated with fuel burning equipment would be reduced with the inactivation of these boilers.