Investigate Possible Damage Under Roadway Depression Caused by Crane Outrigger CX(s) Applied: B1.3Date: 41796 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 6, 2014Investigate Possible Damage Under Roadway Depression Caused by Crane Outrigger
CX(s) Applied: B1.3
Date: 41796
Location(s): South Carolina
Offices(s): Savannah River Operations Office
H-Canyon Construction personnel will excavate an asphalt depression and determine if a Segregated Cooling Water Return pipeline was damaged during crane deployment.