CX-012569: Categorical Exclusion Determination

Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41863 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

August 12, 2014
Estimated Read Time   min
Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building
CX(s) Applied: B1.15
Date: 41863
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Installation of the pre-fabricated building to place over the manway. Revised to correct the DCP number from C-DCP-H-13006 to A-DCP-H-13004.

Document(s) Available for Download