Enclosure Modification Project CX(s) Applied: B1.3 Date: 06/05/2013 Location(s): Tennessee Offices(s): Y-12 Site Office
Office of NEPA Policy and Compliance
June 5, 2013Enclosure Modification Project
CX(s) Applied: B1.3
Date: 06/05/2013
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to convert the temporary enclosure to a permanent enclosure. This work scope involves removing the existing Lexan panels in the ceiling and adding a drop-in ceiling with melt-away panels. In addition, lighting fixtures will be added to the drop in ceiling.