Test Reactor Area - 680 Road Widening CX(s) Applied: B1.32 Date: 09/23/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
September 23, 2013Test Reactor Area - 680 Road Widening
CX(s) Applied: B1.32
Date: 09/23/2013
Location(s): Idaho
Offices(s): Idaho Operations Office
The purpose and need for the proposed action is to widen the gravel interior perimeter road within the Advanced Test Reactor (ATR) Complex at a location near TRA-680 to provide room for vehicles to pass.
CX(s) Applied: B1.32
Date: 09/23/2013
Location(s): Idaho
Offices(s): Idaho Operations Office
The purpose and need for the proposed action is to widen the gravel interior perimeter road within the Advanced Test Reactor (ATR) Complex at a location near TRA-680 to provide room for vehicles to pass.