Replace Potable Water Supply Lines: Phase Two CX(s) Applied: B1.3, B1.16, B1.32, B2.2 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 16, 2013Replace Potable Water Supply Lines: Phase Two
CX(s) Applied: B1.3, B1.16, B1.32, B2.2
Date: 09/16/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Replace the deteriorated 8 inch ductile iron potable water lines and isolation valves to the north end of the Research and Development (R&D) plateau. Roadways which are disturbed due to water line installation are to be repaved.