Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound Emitting Device to Control Algae in the H-Retention Basin CX(s) Applied: B3.6 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 31, 2013"Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound Emitting Device to Control Algae in the H-Retention Basin
CX(s) Applied: B3.6
Date: 07/31/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
This activity is a temporary modification to install an ultrasonic sound emitting device to control algae in the H-Retention Basin. An in-line pH probe will be installed on the H-Retention Basin pump transfer piping to measure and record the pH of the basin. Permission from SCDHEC was obtained to proceed with this activity as a pilot study. "
CX(s) Applied: B3.6
Date: 07/31/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
This activity is a temporary modification to install an ultrasonic sound emitting device to control algae in the H-Retention Basin. An in-line pH probe will be installed on the H-Retention Basin pump transfer piping to measure and record the pH of the basin. Permission from SCDHEC was obtained to proceed with this activity as a pilot study. "